Novitherm Canada Inc.

Home Page

Heat Reflector Overview

Heat Transfer

Frequently Asked Questions

Calculating Savings

Case Studies

Installation Guide

Distributors

Price Schedule

Request for Quotation

Place an Order

Affiliations

Technical Information

Privacy Policy

NOVITHERM CANADA INC.
158 Suffolk Avenue
Oakville, Ontario
CANADA L6K 2L6

Toll Free
1-800-871-0079
(Canada/USA only)

Tel: 905-815-0977
Fax: 905-338-5390

Email:
info@novitherm.com


French Inquiries:
please call Matrix Energy at 1.866.630.5630 Ext 10
Novitherm™ Heat Reflectors – Case Studies

Independent Case Study 1 - performed by Natural Gas Technologies Centre

Independent Case Study 1 - Addenda
Independent Case Study 2 - performed by Natural Gas Technologies Centre
Independent Case Study 3 - performed by Ozz Corporation

NJ Management Services
14 storey apartment building; 94 suites; heated by two atmospheric hot water boilers

Results
10,768 m3 reduction in gas consumption; decreased heating costs over previous year by approximately 12.6%

Payback Period
1.8 years

Details


Numert Investments
10 storey apartment building; 109 suites; heated by two atmospheric hot water boilers

Results
16,886m3 reduction in gas consumption; decreased heating costs over previous year by approximately 11.3%

Payback Period
1.2 years

Details


Biddington Properties Inc.
14 storey apartment building, 184 suites, heated by atmospheric hot water boilers

Results
Reduced heating costs by 14.5%

Payback Period
1 year

Details


Medallion Properties
15 storey apartment buildings; 230 suites each; built in 1963; Toronto, Ontario; Heat Reflectors to address North side of building only

Results
Virtually eliminated ‘cold’ complaints; costs savings amount to over $8,000 annually; 12% reduction in heating costs

Payback Period
8 to 9 months


Metro Toronto Housing Corporation
15 storey apartment building; 379 suites; built in 1971; Scarborough, Ontario; primary/secondary heating loop with DHW fed from primary heating loop

Results
Primary and secondary heating loops reduced by 15° F; Comfort levels improved; 28% reduction in heating costs (1998/99 Vs. 2000/01); Over 121,000 m3 saved ($14,560 at
1999 prices / $38,828 in 2001)

Payback Period
1.3 years at $.12/m3 for natural gas

Details


Greenwin Property Management
2 multi-level residential buildings; free standing cast iron radiators; original windows; Toronto, Ontario
Heat reflectors installed in one building only

Results
Energy savings/comparison – with Heat Reflectors 26.0%; without Heat Reflectors -1.4%

Payback Period
less than 1 year


Belmont Properties
Five, 2 storey, 12 unit, brick apartment buildings;
built in 1958; Etobicoke, Ontario; original hot water boilers with
free-standing cast iron radiators

Results
Between 7% to 19.8% (different results per apartment)

Payback Period
under 2 years

Details


Heritage Building
2 storey, brick building; heated by atmospheric hot water boiler; free standing, cast iron radiators

Results
1,282 m3 reduction in gas consumption; decreased heating costs over previous year by approximately 16.74%; boiler temperature reduced by 20° F

Payback Period
2.38 years

Details


We welcome comments about our website which help us to improve the site and our service to you.