Save Energy • Save Money • Improve Comfort • Reduce Greenhouse Gases
Multi-Residential - Case Studies
Click the links to download PDF's of each case study
Independent Case Study 1 - Performed by Natural Gas Technologies Centre
Addenda Independent Case Study 1 - Performed by Natural Gas Technologies Centre
Independent Case Study 2 - Performed by Natural Gas Technologies Centre
Independent Case Study - Oz Corporation
NJ Management Services
Results
- decreased heating costs over previous year by approximately 12.6%
Details
- 14 storey apartment building, 94 suites, heated by atmospheric hot water.
Numert Investments
Results
- 16,886m3 reduction in gas consumption
- decreased heating costs over previous year by approximately 11.3%
Details
- 10 storey apartment building
- 109 suites
- heated by two atmospheric hot water boilers.
Biddington Properties Inc.
Results
- reduced heating costs by 14.5%
Details
- 14 storey apartment building
- 184 suites
- heated by atmospheric hot water boilers.
Medallion Properties
Results
- virtually eliminated ‘cold’ complaints
- cost savings amount to over $8,000 annually
- 12% reduction in heating costs
Details
- 15 storey apartment buildings
- 230 suites
- built in 1963
- Novitherm Heat Reflectors to address north side of building only
Metro Toronto Housing Corp.
Results
- Primary and secondary heating loops reduced by 15° F
- comfort levels improved
-28% reduction in heating costs (1998/99 vs. 2000/01)
- over 121,000m3 saved ($14,560 at 1999 prices/$38,828 in 2001)
Details
- 15 storey apartment building
- 379 suites
- built in 1971
- primary/secondary heating loop with DHW fed from primary heating loop
Greenwin Property MGMT
Results
- Energy savings/comparison with Novitherm Heat Reflectors 26.0%;
without Heat Reflectors – 1.4%
Details
- 2 multi-level residential buildings
- free standing case iron radiators
- original windows
- heat reflectors installed in one building only
Belmont Properties
Results
- between 7% to 19.8% heat savings (different results per apartment)
Details
- five, 2 storey, 12 unit, brick apartment buildings
- built in 1958
- original hot water boilers with free-standing cast iron radiators
Heritage Building
Results
- 1,282 m3 reduction in gas consumption
- decreased heating costs over previous year by approximately $16.74
- boiler temperature reduced by 20°F
Details
- 12 storey, brick building
- heated by atmospheric hot water boiler
- free standing cast iron radiators
Note: PDF link require Adobe Acrobate to view. Download Acrobat (free download) ![]()
